BHEL withdraws from MB Power’s 800 MW Anuppur project

BHEL said it has withdrawn its acceptance of a letter of intent (LoI) from MB Power (Madhya Pradesh) Limited for the supply of equipment comprising boiler, turbine and generator for a 1×800 MW Anuppur thermal power project. Shares of Bharat Heavy Electricals Ltd ended at ₹316.70, up by ₹7.65, or 2.48%, on the BSE.

Leave a Reply

Your email address will not be published. Required fields are marked *