The order is for the steam generator island package of the 2×660 MW Raghunathpur Thermal Power Station phase-II project in Purulia, West Bengal. Shares of Bharat Heavy Electricals Ltd ended at ₹199.45, down by ₹3.45, or 1.70%, on the BSE.
The order is for the steam generator island package of the 2×660 MW Raghunathpur Thermal Power Station phase-II project in Purulia, West Bengal. Shares of Bharat Heavy Electricals Ltd ended at ₹199.45, down by ₹3.45, or 1.70%, on the BSE.