L&T bags ‘significant’ order to design and construct Agra Metro Phase 1, Line 2

L&T Share Price | The scope of work will involve the design and construction of a vital 15.09 km elevated viaduct, 14 stations and 2.61 km depot connecting the metrlo line from Sadar Bazar to PAC Depot. Architectural finishes to the stations, electrical and mechanical works are also included in the scope of work.

Leave a Reply

Your email address will not be published. Required fields are marked *