Construction is expected to take 24 months, after which the project will generate annual transmission charges of ₹195.2 crore. Shares of IndiGrid Infrastructure Trust ended at ₹140.21, down by ₹0.22, or 0.16%,, on the BSE.
Construction is expected to take 24 months, after which the project will generate annual transmission charges of ₹195.2 crore. Shares of IndiGrid Infrastructure Trust ended at ₹140.21, down by ₹0.22, or 0.16%,, on the BSE.