The facility formed under this JV, will be located at the Bommasandra Industrial Area, Bengaluru, and will have an initial footprint of nearly 20,000 square feet, configured for SMT, THT and box-build assembly lines.
The facility formed under this JV, will be located at the Bommasandra Industrial Area, Bengaluru, and will have an initial footprint of nearly 20,000 square feet, configured for SMT, THT and box-build assembly lines.