The scope of work involves modifying the diversion tunnel into a tunnel spillway arrangement under Package 6 of the project. Located in the South District of Sikkim, the project is expected to be completed within 18 months. Shares of Patel Engineering Ltd ended at ₹39.50, down by ₹0.43, or 1.08%, on the BSE.