The current period includes $61 million in charges related to production disruptions at Sierre, Switzerland, along with higher restructuring and impairment costs, and lower operating performance.
The current period includes $61 million in charges related to production disruptions at Sierre, Switzerland, along with higher restructuring and impairment costs, and lower operating performance.