HCC Share Price | The 4.3 km bridge will comprise approaches of 45 m on the Agardanda side, 145 m on the Dighi side and the main bridge would be 4,120 metre. The project includes two navifation spans with horizontal clearance of 100 m and vertical clearance of 15 m.